Rancangan Bekalan Air Seberang Temerloh

Rancangan Bekalan Air Seberang Temerloh Pakej 1, 2, 3, 4, 9, 10A dan 10B

Date of Site Possession : 2002
Date of Completion : Till 2013
Total Contract Value : RM18,435,341.50

Scope of Works:

  • Study, Design and Tendering Stage for replacing existing AC pipeline to MSCL pipeline.
  • Study, Design and Tendering Stage for new Clear Water Tank, Treated Water Pumpsets and Pumping Station at the proposed location of the future Seberang Temerloh Water Treatment Plant.
  • Study, Design and Tendering stage for Civil, Mechanical, Electrical and related works for Seberang Temerloh new Intake (60MLD) and Treatment Plant (30MLD).
  • Construction and Supervision Stage for all related works.
  • CLIENT Pengurusan Air Pahang Berhad (PAIP) (sebelum ini Jabatan Bekalan Air Pahang)
  • YEAR 2002
  • WE DID Study, Design, Tendering, supervision